Mercurial > hg > rsof
changeset 644:57c0b1592367
now with background/draft minutes
| author | Henry S Thompson <ht@inf.ed.ac.uk> |
|---|---|
| date | Mon, 20 Oct 2025 11:49:38 +0100 |
| parents | 504d9d8d4e06 |
| children | 6e490a674d68 |
| files | MHMC/2025-10-20/agenda.txt MHMC/2025-10-20/ward_renshaw.txt |
| diffstat | 2 files changed, 146 insertions(+), 5 deletions(-) [+] |
line wrap: on
line diff
--- a/MHMC/2025-10-20/agenda.txt Sun Oct 19 10:28:09 2025 +0100 +++ b/MHMC/2025-10-20/agenda.txt Mon Oct 20 11:49:38 2025 +0100 @@ -1,15 +1,55 @@ Meeting House Management Committee Agenda 2025-10-20 Monday 20 October, 5.15 p.m., in 7 Victoria Terrace -* Attendance +* Attendance Draft minute: JP Ascher, Rachael Fitzgerald, Chris + Jardine, Katrina McCrea (via Zoom), Jackie Noltingk, Laragh Quinney, + Sammi Searle, Henry S. Thompson, Andy Tucker, Duncan Wallace * Convenor's report + * Change of representative from Treasury Team + + Draft minute: We welcome Chris Jardine, the new AM Assistant + Treasurer, and say goodbye to Jackie Noltingk, with a very warm + 'Thank You!' for your long service and many contributions to the + work of this committee and your frequent help for its convenor. + * Suggestions from Local Meeting - * Staff escalation route if they need backup + + Turns out HST misunderstood the suggestion from LM Co-Clerk Juliet + Henderson regarding the provision of something to help keep folk + warm in the Meeting Room: it was _blankets_, not gillets. + + Draft minute: We welcome the offer from Central Edinburgh Local + Meeting to purchase a number of blankets to be made available for + people attending Meeting for Worship as the temperature drops and + ask them to liaise with the Managers about practical details such + as storage, signage and cleaning. + * Unpaid leave for Eliza Giles 3 months in August-November 2026: EAPPI + + Draft minute: We are happy to agree to Eliza Giles taking three + months of unpaid leave August--November 2026 to be a volunteer + with the Ecumenical Accompaniment Programme in Palestine and + Israel and wish her well in that very important and challenging + activity. + * Computing infrastructure - * New domains and storage + * New domain and storage + + Jonathan Riddell (the AM Treasurer) and David Sterratt have begun + a restructuring of various aspects of the Area Meeting's computing + infrastructure, in part in response to the creation of a new + domain (quaker.scot), including new email addresses and a move + from Dropbox to Google Drive. AT and HST met with them to discuss + changes this requires and/or enables changes in the Meeting House + computing setup. + * Windows 10 support + + HST and AT have worked together successfully to extend the + provision of security updates to our Windows 10 PCs for a further + year to 1 October 2026. + * Dundee Friends Property Trust * Managers' report @@ -25,13 +65,25 @@ * Finance report +* Heating/Insulation/Energy... + * Community and Renewable Energy Scheme (CARES) + * Works to be undertaken Upper Bow * Report from Majk Stokes * Quinquennial review/News from Trustees -* Heating/Insulation/Energy... - * Community and Renewable Energy Scheme (CARES) +* Staff escalation route if they need backup + + Trustees wrote to us about this, following up on the meeting in + July where SCALP (Scottish Community and Activist Legal Project) + gave Meeting House staff a training session on _Working Well with + the Police_. + + "we need ... an assurance from [MHMC] that staff have an + escalation route whenever they need backup. ... We are happy for + trustees to be on a reserve backup list in case no-one from MHMC + is available." * Date of next meeting
--- /dev/null Thu Jan 01 00:00:00 1970 +0000 +++ b/MHMC/2025-10-20/ward_renshaw.txt Mon Oct 20 11:49:38 2025 +0100 @@ -0,0 +1,89 @@ +Correspondance between Martin Ward (MW), Clerk to AM Trustees and John +Renshaw (JR), contracted to carry out the Quinquennial Review. + +MW, 23 September: + + Thank you for all of the documents which you sent through on 29th + August. While we were able to discuss these briefly at the meeting on + 2nd September our trustees understandably wanted more time to consider + them before making substantive decisions. We have a further meeting + planned for 8th October, and if you were able to answer the following + questions before then it would be appreciated. + The QS's estimate of £90k for the courtyard work is far higher than the + indicative £22,750 in the QR. Does it cover additional work which is + not in the QR figure? Assuming the higher figure is the more reliable + trustees may be inclined to focus on weatherproofing work around the + courtyard and be more selective about replacement of windows. Would + you have a view on which windows should be a priority (in addition to + those to the creche area which you flagged as urgent in the QR)? + Within the weatherproofing work would you be able to advise on what + proportion might reasonably be requested from the owners of the other + properties which would benefit? + +JR, 6 October: + + The budget cost prepared by Gus Simpson of Ralph Ogg & Partners + chartered quantity surveyors includes more extensive work than is + covered by the QFR and also won’t include inflation since the draft + report was issued. Also apologies for not making it clearer - this + cost also includes repairs and re-decoration of the neighbours + windows c. £9k. There is also a contingency sum of£11,740 which + isn’t included in the QFR budget cost and the budget costs don't + include a full allowance for preliminaries. I assume that the + adjoining proprietors will have a shared responsibility for the + repairs to the external fabric of the tenement. I assume that the + works would be carried out in a similar way to the external repairs + to the front elevation of Upper Bow undertaken in 2021 when the + condition of the windows was checked when safe full external access + was available, costs confirmed and repairs carried out once each + proprietor confirmed that they wanted to proceed. + +MW: + + We are interested in moving to improve the Bow Room, possibly as a + separate project which might attract funding and would rather not delay + that work by tying it in with the courtyard. How much synergy there + would be in practice between the two in terms of possible contractors + and access? We assume that work on the Bow Room would be carried out + from Upper Bow, whereas the scaffolding in the courtyard might be + approached (by agreement) from Riddle's Court. I had assumed that the + scaffolding would need to be taken through the common door to the flats + rather than down from the Lawnmarket/Riddle’s Court. Do you have + contact details of who needs to be asked if this is acceptable as it + may change the preliminary costs for the erection and removal of the + scaffolding? I am then happy to contact them. My assumption was that + the main contractors for the external fabric repairs could also manage + the internal works and it would be more efficient in terms of + contractors overheads to carry out the work at the same time. Please + let me know how you want to proceed. + +MW: + + Because of the possible uses of the Bow Room we feel that accessibility + from Upper Bow is more of an issue than access to the rest of the + meeting house. Would it be possible to cut a ramp into the floor + within the building to achieve level access to the existing pavement? + How would this work with an inward opening door? Rising hinges? + +JR: + + I think that the best solutions would either be to set the door back + and form a triangular ramp within the thickness of the external wall + or to discuss the possibility of altering the levels of the pavement + with the Council to form a level platt of Caithness stone outside + the entrance door which then slope downward to the south and west to + meet the existing pavement levels. I guess the cheapest option would + be to obtain and temporary triangular ramp which could be put in + place when needed. We designed a similar temporary ramp for a shop + on the South Bridge which was fixed to the side of the stall riser + and then folded down when needed. This is likely to require LBC + which would likely delay a start to the external repairs although we + could commit to applying for this before the end of October if you + want us to proceed. We would like to agree a finalised version of + the quinquennial report now, but the plans for the two flats should + be added in, page and section numbering checked (for example there + seems to be a gap in the summary between point (d) and point (g)), + and the estimate of costs may need to be adjusted in the light of + the QS assessment. I am finalising this at the moment with the + additional information to include the plans of the two flats and + their condition.
