annotate MHMC/2025-10-20/ward_renshaw.txt @ 648:f032ff21deb4

from Martin
author Henry S Thompson <ht@inf.ed.ac.uk>
date Wed, 22 Oct 2025 20:55:26 +0100
parents 57c0b1592367
children
Ignore whitespace changes - Everywhere: Within whitespace: At end of lines:
rev   line source
644
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
1 Correspondance between Martin Ward (MW), Clerk to AM Trustees and John
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
2 Renshaw (JR), contracted to carry out the Quinquennial Review.
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
3
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
4 MW, 23 September:
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
5
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
6 Thank you for all of the documents which you sent through on 29th
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
7 August. While we were able to discuss these briefly at the meeting on
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
8 2nd September our trustees understandably wanted more time to consider
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
9 them before making substantive decisions. We have a further meeting
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
10 planned for 8th October, and if you were able to answer the following
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
11 questions before then it would be appreciated.
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
12 The QS's estimate of £90k for the courtyard work is far higher than the
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
13 indicative £22,750 in the QR. Does it cover additional work which is
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
14 not in the QR figure? Assuming the higher figure is the more reliable
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
15 trustees may be inclined to focus on weatherproofing work around the
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
16 courtyard and be more selective about replacement of windows. Would
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
17 you have a view on which windows should be a priority (in addition to
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
18 those to the creche area which you flagged as urgent in the QR)?
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
19 Within the weatherproofing work would you be able to advise on what
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
20 proportion might reasonably be requested from the owners of the other
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
21 properties which would benefit?
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
22
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
23 JR, 6 October:
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
24
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
25 The budget cost prepared by Gus Simpson of Ralph Ogg & Partners
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
26 chartered quantity surveyors includes more extensive work than is
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
27 covered by the QFR and also won’t include inflation since the draft
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
28 report was issued. Also apologies for not making it clearer - this
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
29 cost also includes repairs and re-decoration of the neighbours
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
30 windows c. £9k. There is also a contingency sum of£11,740 which
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
31 isn’t included in the QFR budget cost and the budget costs don't
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
32 include a full allowance for preliminaries. I assume that the
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
33 adjoining proprietors will have a shared responsibility for the
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
34 repairs to the external fabric of the tenement. I assume that the
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
35 works would be carried out in a similar way to the external repairs
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
36 to the front elevation of Upper Bow undertaken in 2021 when the
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
37 condition of the windows was checked when safe full external access
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
38 was available, costs confirmed and repairs carried out once each
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
39 proprietor confirmed that they wanted to proceed.
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
40
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
41 MW:
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
42
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
43 We are interested in moving to improve the Bow Room, possibly as a
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
44 separate project which might attract funding and would rather not delay
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
45 that work by tying it in with the courtyard. How much synergy there
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
46 would be in practice between the two in terms of possible contractors
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
47 and access? We assume that work on the Bow Room would be carried out
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
48 from Upper Bow, whereas the scaffolding in the courtyard might be
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
49 approached (by agreement) from Riddle's Court. I had assumed that the
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
50 scaffolding would need to be taken through the common door to the flats
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
51 rather than down from the Lawnmarket/Riddle’s Court. Do you have
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
52 contact details of who needs to be asked if this is acceptable as it
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
53 may change the preliminary costs for the erection and removal of the
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
54 scaffolding? I am then happy to contact them. My assumption was that
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
55 the main contractors for the external fabric repairs could also manage
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
56 the internal works and it would be more efficient in terms of
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
57 contractors overheads to carry out the work at the same time. Please
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
58 let me know how you want to proceed.
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
59
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
60 MW:
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
61
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
62 Because of the possible uses of the Bow Room we feel that accessibility
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
63 from Upper Bow is more of an issue than access to the rest of the
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
64 meeting house. Would it be possible to cut a ramp into the floor
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
65 within the building to achieve level access to the existing pavement?
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
66 How would this work with an inward opening door? Rising hinges?
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
67
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
68 JR:
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
69
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
70 I think that the best solutions would either be to set the door back
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
71 and form a triangular ramp within the thickness of the external wall
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
72 or to discuss the possibility of altering the levels of the pavement
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
73 with the Council to form a level platt of Caithness stone outside
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
74 the entrance door which then slope downward to the south and west to
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
75 meet the existing pavement levels. I guess the cheapest option would
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
76 be to obtain and temporary triangular ramp which could be put in
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
77 place when needed. We designed a similar temporary ramp for a shop
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
78 on the South Bridge which was fixed to the side of the stall riser
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
79 and then folded down when needed. This is likely to require LBC
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
80 which would likely delay a start to the external repairs although we
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
81 could commit to applying for this before the end of October if you
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
82 want us to proceed. We would like to agree a finalised version of
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
83 the quinquennial report now, but the plans for the two flats should
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
84 be added in, page and section numbering checked (for example there
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
85 seems to be a gap in the summary between point (d) and point (g)),
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
86 and the estimate of costs may need to be adjusted in the light of
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
87 the QS assessment. I am finalising this at the moment with the
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
88 additional information to include the plans of the two flats and
57c0b1592367 now with background/draft minutes
Henry S Thompson <ht@inf.ed.ac.uk>
parents:
diff changeset
89 their condition.